Randolph Engineering has had a long standing working relationship with the Town of Buffalo. The following is a partial list of the projects the town has selected Randolph Engineering to perform:
Buffalo Collection and Treatment Project
The Buffalo sanitary sewer collection and treatment system project involved the preparation of specifications, design and inspection of the construction of a wastewater collection and treatment system for the Town of Buffalo. The design included the preparation of bid and contract documents and evaluation of bids. Construction of the collection system included installation of 100 precast manholes, 35 cleanouts, 37,840 L.F. for gravity sewer line and 3,500 L.F. of force main sewer line as well as the design and construction of the aerated lagoon treatment plant.
Toyota Manufacturing Facility Extension Project
The Toyota Manufacturing Facility sanitary sewer collection system project involved the preparation of specifications, design and inspection of the construction of a wastewater collection system extension. The sanitary sewer system extension involved the installation of 2,446 L.F. of gravity collection line including 10 manholes.