The project involved the study, design and preparation of contract documents for a 148 unit apartment complex to be constructed on a 10 acre site in Putnam County.
Site design responsibilities included subdivision lot layout, grading, interior roadway design, pavement design, well as the design of the storm water system including storm water detention. Specific features included:
- 95,000 SF of asphalt paving
- 7,300 SF of concrete sidewalk
- 1,200 LF of 6" water line
- 2,300 LF of 8" sanitary sewer line
Additional design responsibilities included obtaining all permits including N.P.D.E.S. permits and WV Health Department and Putnam County Planning Commission permits.
Surveying services included topographic mapping for design purposes, survey plat development and construction stakeout.